Home›Success stories›Preheating several moulds at once with a 72 kW SMART 6
Injection moulding

Mould preheating station: a 72 kW SMART 6 heats several moulds at once

An injection moulding plant was losing machine time at every mould change, waiting for the new mould to reach temperature. A mobile station with a 72 kW MARSE SMART 6 temperature control unit and a multi-coupling rack heats several moulds in parallel, away from the injection moulding machine and while production continues.

SectorPlastic injection
Equipment
SMART 6high-power temperature control unit
Power
72 kWheating
Molds
Several at oncewith multi-coupling rack
Mounting
Mobile frametaken wherever it is needed
Estación móvil de precalentamiento de moldes con atemperador MARSE SMART 6 y rack de multiacoplamiento
Mobile station: 72 kW SMART 6 with multi-coupling rack for several moulds.

The case at a glance

Application
Preheating of injection moulds before the mould change.
Equipment
MARSE SMART 6 72 kW temperature control unit on a mobile frame.
Capacity
Several moulds at once, with a multi-coupling rack.
Aim
Take mould heating out of the injection moulding machine's downtime.
Control
Heating and cooling PID with temperature ramps.

The process and the initial problem

In injection moulding, the mould change time does not end when the mould is mounted: it ends when the mould is at process temperature and the machine is producing good parts. If the mould is heated once mounted, the injection moulding machine stands idle the whole time.

The process solution is to decouple the two: the next mould is heated in a separate station while the injection moulding machine keeps producing with the current mould. To pay off, the station needs enough power and must be able to serve several moulds at once.

Challenge and solution

Mould heating no longer takes up injection moulding machine time: it is done before the change.

The challenge
  • The new mould was heated once mounted on the injection moulding machine
  • The machine stood idle until the mould reached temperature
  • Heating time repeated at every change
The solution
  • The next moulds are connected to the station while the injection moulding machine produces
  • A single SMART 6 heats several moulds at once
  • The mould arrives hot at the change: the injection moulding machine starts up sooner

An indicative calculation

Energy needed to heat a 1,000 kg steel mould by 60 °C, without losses:

1,000 kg mould, +60 °C≈ 8 kWh≈ 7 min at 72 kW
Same mould on the injection moulding machine≈ 8 kWhthe machine stands idle all that time

Theoretical example with steel of specific heat 0.49 kJ/kg·K. The actual time depends on losses, flow rate and mould geometry.

Why a MARSE temperature control unit in this case

For the process engineer

  • 72 kW of heating: power for several moulds in parallel.
  • Controlled heating ramps: the mould heats evenly, without thermal shock.
  • Heating and cooling PID with auto-tuning: the mould reaches the setpoint exactly and holds it.
  • The mould goes into the machine already at temperature: fewer start-up parts scrapped.

For the maintenance manager

  • Mobile station on wheels: it can be moved to the mould preparation area.
  • Multi-coupling rack: tidy connections, supply in red and return in blue.
  • A single unit for all mould preparation, instead of tying up machine temperature control units.
  • Settings saved via USB to repeat every change.

Technical keys

  1. Heating outside the machineHeating overlaps with production of the previous mould.
  2. One unit, several moulds72 kW and a multi-coupling rack to work in parallel.
  3. Mobile stationThe unit goes where the moulds are prepared.
  4. Repeatable start-upSame ramps and setpoints at every change.

Result

Shorter mould changeHeating is taken out of downtime.
More injection moulding machine hoursThe machine produces while the next mould is prepared.
Several moulds readyA single station prepares several moulds at once.

Frequently asked questions

What is a mould preheating station?

It is a temperature control unit, usually mobile, that heats the next mould outside the injection moulding machine while the machine keeps producing. This way the mould arrives at the change already at process temperature.

How many moulds can it heat at once?

In this case, a 72 kW SMART 6 with a multi-coupling rack supplies several moulds in parallel. The number depends on the size of the moulds and the target temperature.

What do you gain at the mould change?

All the heating time stops being machine downtime, and the first parts come out good because the mould is already at temperature.

Equipment and technology

Other success stories

← All success stories
Do you have a similar process?Tell us what you need to solve and we will propose the right unit.
Talk to a specialist

Mould preheating station: a 72 kW SMART 6 heats several moulds at once

Equipment with marking EC · European conformity
MARSE
Privacy Summary

This website uses cookies to offer you the best possible user experience. Cookie information is stored in your browser and performs functions such as recognizing you when you return to the website and helping the computer understand which sections of the website you find most interesting and useful.